Pz.Kpfw.III Ausf.L — Fgst.Nr. 74501
Combat Path and Unit Assignments
1943.07.05
Combat
7. Panzer-Division · Kursk — Belgorod
In July 1943, the division participated in Operation Citadel (Battle of Kursk), providing northern flank cover for the main offensive along the Donets.
1943.07.31
7. Panzer-Division
Combat-ready
Spalte 19: Pz.Kpfw. III mit 5 cm Kw.K. L/60
Status 2a: Operational / Combat ready
Źródło: RH.021.04.450.S0301
1943.09.09
Combat
7. Panzer-Division · Poltava — Kremenchug — Dnieper
In September 1943, the division retreated through Poltava and crossed the Dnieper at Kremenchug on 9 September, entering heavy defensive operations.
1943.09.30
7. Panzer-Division
Zur Instandsetzung bei Pz.Inst.Abt.: 1 Pz.Kpf.Wg. III L/60, Fg.-Nr. 74,501 (Under repair at division repair battalion: 1 Pz.Kpf.Wg. III L/60, chassis no. 74501)
Spalte 19: Pz.Kpfw. III mit 5 cm Kw.K. L/60
Status 2c: Under repair outside the unit (1943 form); 1944 form: repair by the unit over 14 days
Źródło: T313.R391.S0521
1943.09.30
7. Panzer-Division
Zur Instandsetzung bei Pz.Inst.Abt.: 1 Pz.Kpf.Wg. III L/60, Fg.-Nr. 74,501 (Under repair at division repair battalion: 1 Pz.Kpf.Wg. III L/60, chassis no. 74501)
Spalte 19: Pz.Kpfw. III mit 5 cm Kw.K. L/60
Status 2c: Under repair outside the unit (1943 form); 1944 form: repair by the unit over 14 days
Źródło: RH.021.04.452.S0779
1943.10.31
7. Panzer-Division
Repair outside unit
Spalte 19: Pz.Kpfw. III mit 5 cm Kw.K. L/60
Status 2c: Under repair outside the unit (1943 form); 1944 form: repair by the unit over 14 days
Źródło: T313.R391.S0384
1943.10.31
7. Panzer-Division
Repair outside unit
Spalte 19: Pz.Kpfw. III mit 5 cm Kw.K. L/60
Status 2c: Under repair outside the unit (1943 form); 1944 form: repair by the unit over 14 days
Źródło: RH.021.04.452.S0559
1944.01.31
7. Panzer-Division
Under repair by the unit
Spalte 19: Pz.Kpfw. III mit 5 cm Kw.K. L/60
Status 2b: Under repair by the unit (1944 form: up to 14 days)
Źródło: RH.021.04.453.S0204
1944.02.29
7. Panzer-Division
Under repair by the unit
Spalte 19: Pz.Kpfw. III mit 5 cm Kw.K. L/60
Status 2b: Under repair by the unit (1944 form: up to 14 days)
Źródło: RH.021.04.454.S0093
1944.03.25
Combat
7. Panzer-Division · Kamenets-Podolsky — Ternopil
In spring 1944, the division fought around Ternopil and took part in breaking out of the Kamenets-Podolsky pocket, suffering heavy losses.
1944.03.31
Sturmgeschütz-Brigade 311
Operational / Combat ready (number in list 2a, an arrow leads from the number to the handwritten annotation “Bef. III ?”)
Spalte 46: Pz.Bef.Wg. mit 5 cm Kw.K. L/60
Status 2a: Operational / Combat ready
Źródło: RH.021.04.454.S0628
Production Metrics
Version (Ausf.): Pz.Kpfw.III Ausf.L
Production date: 1942.10
Producer: M.A.N. Werk Nuernberg
Main armament: 5 cm Kw.K. L/60
Data source: Panzer Tracts 03-3-42/44
Rebuilds and Special Conversions
No conversions or special modifications registered for this vehicle.
Repair Log and Technical Events
No technical events recorded.
Design Features and Anomalies
No specific features recorded for this vehicle.
Photographic Documentation
No associated archival photos for this chassis number.