Pz.Kpfw.III Ausf.L — Fgst.Nr. 72325
In July 1943, the division participated in Operation Citadel (Battle of Kursk), providing northern flank cover for the main offensive along the Donets.
7. Panzer-Division
Combat-ready
In September 1943, the division retreated through Poltava and crossed the Dnieper at Kremenchug on 9 September, entering heavy defensive operations.
7. Panzer-Division
Zur Instandsetzung bei Truppe: 1 Pz.Kpf.Wg. III L/60, Fg.-Nr. 72,325 (Under repair at unit: 1 Pz.Kpf.Wg. III L/60, chassis no. 72325)
7. Panzer-Division
Zur Instandsetzung bei Truppe: 1 Pz.Kpf.Wg. III L/60, Fg.-Nr. 72,325 (Under repair at unit: 1 Pz.Kpf.Wg. III L/60, chassis no. 72325)
7. Panzer-Division
Total write-offs (Totalausfälle) – Panzerbeschuß. Vom Pz.Inst.Abt. wegen Totalausfall im Heeres-Zeugamt abgeschoben. (armour hit. Evacuated by tank repair detachment due to total write-off to the army ordnance depot). [VEHICLE LOST]
7. Panzer-Division
Total write-offs (Totalausfälle) – Panzerbeschuß. Vom Pz.Inst.Abt. wegen Totalausfall im Heeres-Zeugamt abgeschoben. (armour hit. Evacuated by tank repair detachment due to total write-off to the army ordnance depot). [VEHICLE LOST]
Version (Ausf.): Pz.Kpfw.III Ausf.L
Production date: 1942.06
Producer: Daimler-Benz AG, Stuttgart-Untertürkheim
Main armament: 5 cm Kw.K. L/60
Data source: Panzer Tracts 03-3-42/44
No conversions or special modifications registered for this vehicle.
No technical events recorded.
No specific features recorded for this vehicle.
The Spalte field value (19) was determined based on the handwritten vehicle type designation "III L/60" in the original archival document [Source: T313.R391.S0494].
No associated archival photos for this chassis number.